Wireless resumes:


Wireless employers & recruitment agencies post telecoms jobs for free; search resume & find candidates. Telecom professionals just register and apply with your resume directly to the hiring managers; find new careers, contracts & consulting opportunities.

Telecoms employers & companies

AZ CONNEX SARL
pathstreet
xeric
Nokia Solution Network
Trident
First Point Group
Chemiron Impex Pvt Ltd
First Point Group
IT Solutions Inc
First Point Group
More recruiters & agencies...
Recruiters by regions...




Preview 3g Resume

Resume Title: Senior RF Planning & Optimization Engineer

Resume keywords summary:

Contact Information
  
Please log in to see contact information!

Work Experience
Experience level: 5-10 years
Profile/Cover Letter:
Peeravee Tripakornkusol
Senior RF Planning & Optimization Engineer
PROFILE
About 8. 5 years of experiences in GSM, GPRS & EDGE. Skilled in GSM single/dual band RF planning&optimization for macro, micro & pico sites and transmission link for microwave link. Experienced in Huawei , Motorola & Nokia BSS.


PROFESIONAL RELEVANT EXPERIENCE:

Nokia Siemens Networks (Qatar) Company., Senior RF Planning & Optimization Consultant. 2008(June, 28) –2009(Feb, 26),
Doha, Qatar.
NSN - Qtel Project.( Nokia - Qtel Qatar Project)
(GSM 900 & 1800 ,GPRS & EDGE : Nokia network )

• Support 2G/2.5G optimization activities, RF Performance and KPI monitoring for site acceptance after BSS swapped from Alcatel/Motorolla to Nokia equipment. Works in Dual Band Network GSM900/DCS1800, Common BCCH and AMR Full Rate/Half Rate Network (S12)
• Perform FAT report (Final Acceptance Test) for swap site project. (Outdoor Macro & Indoor site)
• Generate KPI’s statistics using BONZO optimization tool and identify top worst performing cells and able to initiate corrective actions to meet the required KPIs
• Analyze drivetest data using Actix and Mapinfo to check the downlink network performance (RxLev, RxQual, SQI, Best Server, Drop calls ,MCS, RLC/LLC Throughput etc.). Initiate short and long term solutions to enhance network performance and alleviate problems encountered in the drivetest analysis
• Optimization of dual band parameters and recommend parameter features to balance traffic and proper hand-over between two layers GSM900 and DCS1800.
• Troubleshooting action, including frequency planning for BCCH retune , neighboring optimization, tilts , optimal power setting adjustment and set optimum value of hand-over parameter settings
• Use Nokia’s Plan Editor version 4.5 to import/export xml file.
• Perform RF drive test & analyze drive test(GSM ,GPRS, EDGE&BCCH Scanning) by TEMS 7.1 & TEMS 8.0.
• Perform NetAct OSS statistics report tool to get all statistics data to do KPI report.
• Check & Monitoring KPI for GSM, GPRS & EDGE. (%Drop call rate, %TCH block, %HO failed rate,% SDCCH drop rate , %Interference, TBF Drop Rate etc.)
• Parameters audit & Parameters changing . (HO parameter, Power Control parameter, BTS parameter , Frequency etc.)
• Parameter checking & changing by MML command (ZEEI, ZEUO etc.) & Network Doctor reports.(60, 61, 62, 153 etc.)
• Trial CommonBCCH feature for 1 BSC & Implement CommonBCCH feature for whole country about 19 BSC. (Qatar)
• Planning & Optimization new site (Outdoor Macro & Indoor site) both dual band & Common BCCH.
• Perform TRX Upgrade/Downgrade capacity & do KPI report.




Nokia Siemens Networks (IRAN) Company., Senior RF Planning & Optimization Consultant. 2008(Jan, 5) – 2008(May, 4),
Tehran, IRAN.
NSN - MCCI Project.( Nokia - MCCI IRAN Project)
(GSM 900 & 1800 ,GPRS & EDGE : Nokia network )

• Perform GSM Optimization & RF features such as AMR, Common BCCH , GPRS & EDGE.
• Check & Monitoring KPI for AMR & GSM. (%Drop call rate, %TCH block, %HO failed rate,% SDCCH drop rate , AMR codec distribution in TEMS, %Interference etc.)
• Parameters audit & Parameters changing . (HO parameter, Power Control parameter, BTS parameter , Frequency etc.)
• Perform RF drive test & analyze drive test. (GSM ,GPRS & BCCH Scanning )
• Parameter checking & changing by MML command (ZEEI, ZEUO etc.) & Network Doctor reports.(60, 61, 62, 153 etc.)
• Frequency audit for GSM900, GSM1800 & Common BCCH.
• Make worse cells report, GPRS & EDGE report and transfer knowledge to local operator engineer.






Name : Peeravee Tripakornkusol



Nokia Siemens Networks (LAM;LatinAmerica)Company., Senior RF Performance &Optimization Engineer.
Recife, Brazil. 2007(Aug,20) – 2007(Dec,22),
NSN - CLARO Project.( Nokia - CLARO BRAZIL Project)
(GSM 900 & 1800, GPRS & EDGE : Nokia network )

• Perform GSM, GPRS & EDGE Optimization (Voice&Data) & RF features such as AMR, Half Rate, GPRS&EDGE.
• Check & Monitoring KPI for AMR, GSM, GPRS & EDGE. (%Drop call rate, %TCH block, %HO failed rate,% SDCCH drop rate ,AMR codec distribution, FER &BER, %Interference , Usage of GPRS, GPRS territory update success & block, TBF success, TBF Drop etc.)
• KPI monitor & report. (Per cells /Per BSC : CSSR, SCR, SDCCH drop, SDCCH block, TCH drop, TCH block, TCH Assignment, HOSR, EMD, Traffic trend, TBF block, TBF Drop, TBF success rate, CS1-4, MCS1-9 etc.)
• Perform RF drive test TEMS 6.1 & analyze drive test. (GSM , GPRS & EDGE)
• Parameters checking by MML command & NetAct (ZEEI, ZEUO, ZEQO etc.),Network Doctor Report (111,153,163, 166,182,195,196 204, 216, 226 etc.) & PlanEdit. (Nokia)
• KPI formula & counters analyze.
• Network monitor (TRX , Cell, BTS & BSC alarm) & use optimize statistic tools. (REMOPT & Claro Performance)
• Parameters checking & changing . (HO parameter, Power Control parameter, BTS parameter , Frequency etc.)
• Writing reports with regard to the coverage , capacity, quality. (Main KPI)




ASIACELL (Iraq) Company., Senior RF Planning & Optimization Engineer. 2007 (April, 21) – 2007 (July26), Mobile Operator in Iraq.
(GSM, GPRS & EDGE : HUAWEI network )

• Planning of individual sites for coverage, capacity purposes and C/I predictions for BTS Asset 5.1.(Aircom tool;GSM)
• Analyze drive test by TEMS Investigation 5.1 & 6.1. (Dedicated mode & Scan frequency mode)
• Capacity planning for making new sites plan.
• Retune frequency. (BB hopping & RF hopping)
• Changing some parameters for improve KPI & Optimize network for achieve KPI target.
• Performed Huawei tool. (OMC shell, NMS2000, AutoCFG , Alarm monitor, BTS monitor & traffic statistic)
• Use Aircom Optima for checking traffic statistics.





EFLAG Technologies Company ., Senior RF Optimization engineer. (Indoor Project) 2007 (Mar,5 ) –2007 (Mar,31 ), Kuala Lampur, Malaysia.
Nokia - Maxis Communication Project.(GSM & UMTS Project)
(GSM 900 , 1800 & UMTS : Indoor Project)
• Site Audit for indoor project. (Antenna location, Splitter ,Combiner, Feeder, Duplexer)
• Walk test by TEMS & NEMO tool & Analyze walk test by NEMO Analyzer. (GSM & UMTS)
• Recommended for improving Signal Strength & Quality. (RXLevel, RxQuality, C2, RSCP & Ec/No)
• Recommended for changing some parameters. (Frequency , Ncell, SC, Monitor cell etc.)
• Calculation link power budget , EIRP table for design network.
• Make site acceptance report, recommendation report & transfer knowledge to local engineer.








Name : Peeravee Tripakornkusol

Nokia (South Africa) Company., Senior RF Planning & Optimization Engineer. 2006 (Sep, 21) – 2007 (Mar, 1), (Windhoek /Whole country), Namibia.
Nokia - Cell One Project.( Powercom - Telenor Project)
(GSM 900 , 1800 & UMTS : Nokia network )
Technical Role.
• Planning of individual sites for coverage, capacity purposes and C/I predictions for BTS by NetAct5.1.(GSM& UMTS)
• Active participation on the design and implementation of GSM & UMTS sites.
• Performed Site Survey (SARF, SAR & TSSR) to design antenna placement, antenna orientation, antenna type, tilt and other design aspects. (New site; GSM & UMTS)
• Site survey & audit. (RF site survey ; Site location , BTS location , antenna type, antenna height, antenna direction, antenna tilt, BTS configuration, type of feeder , serving area, how to route feeder, TX/RX/RXD feeder path .
• Updated data in EPM. (Nokia Project database)
• Initial Microwave LOS Survey.
• Nemo Outdoor 4.20.73 drive test tool & PCTEL Scanner (Seegull). (GSM & UMTS)

Nokia (Kuwait) Company., Senior RF/BSS Planner / Project Co-ordinator. 2006 (May, 30 ) –2006 (Aug, 27 ), (Northern Iraq), Iraq.
Nokia - MTC Atheer Project.(Iraq Project)
(GSM 900 : Nokia network )
Technical Role.
• Setup new Nokia network. (SAR, Freq. Pattern, Ncell & BTS parameter.)
• BSC dimension & BSC capacity.
• Planning of individual sites for coverage, capacity purposes and C/I predictions for BTS by NetAct.
• Performed Technical Site Survey (SAR & TSSR) to design antenna placement, antenna orientation, antenna type, tilt and other design aspects. (New site)
• Frequency (EGSM&PGSM frequency : MBCCH ,TCH ,SDCCH , BSIC :RF Hopping Mode ) & Neighbour planning. ( New site)
• GSM & GPRS Nokia parameter planning. (Power control parameter , HO parameter, BTS parameter, Dual rate etc. )
Project Co-ordinator.
• Interface with customer (MTC group) & transmission team. (Metco & Harris)
• Interface with subcontractor. (SAR & TSSR & Telecom Implement)
• Technical meeting with customer & Interface with any vendor. (Motorola)

Leadcom (Italy) Company., Senior RF Planning & Optimization Engineer. 2005 (Nov,17 ) – 2006(May14), (Addis Abeba / Whole country), Ethiopia.
Nokia - ETC Project.
(GSM 900 & DCS 1800 : Nokia network : Swap site project < Swap from ZTE to Nokia > & New site project.)
- RF Planning Scope
• Planning of individual sites for coverage, capacity purposes and C/I predictions for BTS by NetAct.
• Performed Technical Site Survey (TSS & TSSR) to design antenna placement, antenna orientation, antenna type, tilt and other design aspects. (ZTE swap project : Swap from ZTE to Nokia.)
• Frequency (Dualband frequency : MBCCH ,TCH ,SDCCH , BSIC : RF Hopping Mode ) & Neighbour planning. ( New site ,Upgrade site )
• Line of site (LOS) survey (Microwave transmission)
• GSM & GPRS Nokia parameter planning. (Power control parameter , HO parameter, BTS parameter, Dual rate, RAC, NSEI, Dedicate & Default TS, GTRX etc. )
• Nokia SRC(Smart Radio Concept) for increasing coverage.
- RF Drive Test Scope
• Drive test by TEMS Investigation 5.1 & 6.1. (For optimize GSM : Addis Abeba & Whole country )
- RF Optimization Scope
• Analyze GSM & GPRS drive test problems (By MapInfo&TEMS) and determine if caused by poor RF coverage, RF interference, poor handover parameters, poor power control, UL&DL RLC Throughput rate is low speed etc.
• Analyze new site for checking KPI. (Coverage both dedicated&idle mode, Drop call, RXQuality, Interference, Handover etc.)
• Check & Monitoring traffic statistics for GSM & GPRS. (%Drop call rate, %TCH block, %HO failed rate, %Interference ,Usage of GPRS,GPRS territory update success & block etc.).
• Parameter checking & changing by MML command (ZEEI, ZEUO etc.), Network Doctor reports & Planedit.(Nokia)
Name : Peeravee Tripakornkusol

Nexwave (Singapore) PTE., Senior RF Planning & Optimization Engineer. 2005 (Aug,24) – 2005 (Nov,14), Semalang(Central Java) , Indonesia.
Nokia - INDOSAT Project.
(GSM 900 & DCS 1800 : Nokia network : Swap site project < Swap from Alcatel to Nokia > & New site project.)
- RF Planning Scope
• Planning of individual sites for coverage, capacity purposes and C/I predictions for BTS by NetAct.
• GSM & GPRS Nokia parameter planning. (Power control parameter , HO parameter, BTS parameter, Dual rate, RAC, NSEI, Dedicate & Default TS, GTRX etc. )
- RF Drive Test Scope
• Drive test by TEMS Investigation 4.1.1. (For optimize GSM & GPRS )
- RF Optimization Scope
• Analyze GSM drive test problems for the whole network(By MapInfo&TEMS) and determine if caused by poor RF coverage, RF interference, poor handover parameters, poor power control etc.
• Analyze GPRS drive test problems for the whole network(By MapInfo&TEMS) and determine if caused by GPRS Attach failed, PDP context Activated failed, Cell Re-selection failed, UL&DL RLC Throughput rate is low speed etc.
• Analyze new site for checking KPI. (Coverage both dedicated&idle mode, Drop call, RXQuality, Interference, Handover etc.)
• Check & Monitoring traffic statistics for GSM & GPRS. (%Drop call rate, %TCH block, %HO failed rate, %Interference ,Usage of GPRS,GPRS territory update success & block etc.)
• Basic Optimisation: changing Azimuths, Tilts, antenna heights, Retune of frequencies, Cell Neighbour management.
• KPI monitor & report. (Per cells /Per BSC : CSSR, SCR, SCCHD drop, SCCHD block, TCH drop, TCH block, TCH Assignment, HOSR, EMD, Traffic trend)
• Parameter checking & changing by MML command (ZEEI, ZEUO etc.), Network Doctor reports & Planedit.(Nokia)

Total Access Communication (DTAC-Telenor) PLC, RF Planning & Optimization Engineer / RF Drive Test Engineer.
Bangkok, Thailand 2003 (Sep) – 2005(Sep),
(GSM 1800 : Nokia & Motorola network)
- RF Planning Scope
• Planning of individual sites for coverage, capacity purposes and C/I Predictions by TEMS Cell Planner/Asset/NetAct. (both indoor and outdoor)
• Active participation on the Design and implementation of GSM & GPRS & EDGE Sites.
• Frequency(MBCCH ,TCH ,SDCCH , BSIC) & neighbour planning.( New site ,Upgrade site , Retune-frequency)
• GSM , GPRS & EDGE Nokia parameter planning. (Power control parameter , HO parameter, BTS parameter, Dual rate, RAC, NSEI, Dedicate & Default TS, GTRX etc. )
• Site survey (TSS) & Supervisor (RF site survey ; Site location , BTS location , antenna type, antenna height, antenna direction, antenna tilt, BTS configuration, type of feeder , serving area, how to route feeder, TX/RX/RXD feeder path .
• RF design by using RF equipment such as TMA ,TMB(Booster) & Repeater.
• GSM, GPRS & EDGE RF Planning for TRX capacity to support event( Exibition event ,Congratulation event etc.)
• RF inspection for BTS , antenna , feeder ,antenna jumper for checking VSWR & Return loss & Cable loss.
- RF Drive Test Scope
• Drive test by TEMS Investigation , TEMS Light & NEMO.(For optimize GSM,GPRS & EDGE)
- RF Optimization Scope
• Analyze GSM drive test problems for the whole network(By MapInfo&Actix) and determine if caused by poor RF coverage, RF interference, poor handover parameters, poor power control etc.
• Analyze GPRS&EDGE drive test problems for the whole network(By MapInfo&Actix) and determine if caused by GPRS Attach failed, PDP context Activated failed, Cell Re-selection failed, UL&DL RLC Throughput rate is low speed etc.
• RF analyze for doing GSM&GPRS RF benchmark (RXLevel , RXQuality, Call setup, Handover, Drop call, UL&DL RLC Throughput rate etc.) compare with another operators & another vendors. (Nokia, Ericsson, Siemens, Alcatel, Motorola and Huawei)
• Analyze new site for checking KPI. (Coverage both dedicated&idle mode, Drop call, RXQuality, Interference, Handover etc.)
• Check & Monitoring traffic statistics for GSM & GPRS. (%Drop call rate, %TCH block, %HO failed rate, %Interference ,Usage of GPRS,GPRS territory update success & block etc.)
• Check interference by using Spectrum Analyzer.
• RF optimization by using RF equipment such as TMA ,TMB(Booster) & Repeater.(Solving for BTS transmitter power, Uplink & Downlink quality ,Uplink & Downlink path balance , reduced drop call rate. etc.)
• Upgrade capacity (TCH TS & GP TS in TRX unit) for GSM & GPRS quality.


Name : Peeravee Tripakornkusol

Huawei Technologies(Thailand)Co.,Ltd.,BSS Engineer(BTS&BSC&GPRS)/RF Drive Test Engineer. 2002 (June) –2003 (Aug), Northern Region , Thailand
(GSM 900/1800 : Huawei network)

• Co-project management for site implement & logistic.
• Site survey
• Performed as telecom implement supervisor. (Antenna , feeder , BTS, BSC , Transcoder & PCU)
• Commissioning & integration GSM 900&GSM1800 for Huawei equipment. ( BTS, BSC , Transcoder & PCU)
• Installation & Commissioning & Integration 10 new Huawei BSC & 200 new BTS.
• Create parameter for BTS & BSC.
• Upgrade capacity for BTS ,BSC, Transcoder & PCU.
• Set up OMC equipment. ( router & mercury for connect whole GSM network ; BTS ,BSC & PCU path)
• Performed as OMC-R & BSS KPI engineer.
• PAT & FAT report
• Perforned as RF Drive test for support RF team.(TEMS Investigation version3 tool)

Keppel Communications Pte Ltd., Project Engineer(BTS)/RF Drive Test Engineer. 2002 (Feb) – 2002 (April), Southern Region , Thailand
(GSM 900/1800 : Nokia network)

• Co-ordinate with sub-contractor & RF Team.
• Site survey for new site & expansion site.
• Performed as telecom implement supervisor. (Both indoor & outdoor)
• Installation ,commissioning & integration GSM 900&GSM1800 for Nokia BTS.( Intratalk ,Metrosite & Ultrasite)
• BTS troubleshooting.
• Site supervisor & site inspector.(adjust antenna , test feeder & antenna by Site master equipment)
• PAT & FAT site report.
• Perforned as RF Drive/walk test engineer(TEMS Investigation version3 tool)

Real Time Access communication Co.,Ltd , BTS Engineer/RF Drive Test Engineer. 2001 (Oct) – 2002 (Jan), Western Region , Thailand
(GSM 900/1800 : Nokia network)

• GSM & GPRS drive test by TOM tool.
• Co-ordinate with sub-contractor & RF Team.
• Site survey for new site & expansion site.
• Performed as telecom implement supervisor. (Both indoor & outdoor)
• Installation ,commissioning & integration GSM 900&GSM1800 for Nokia BTS.( Intratalk ,Metrosite & Ultrasite)
• BTS troubleshooting.
• Site supervisor & site inspector. (Adjust antenna , test feeder & antenna by Site master equipment)
• PAT & FAT site report.
• Perforned as RF Drive/walk test engineer(TOM tool)

Soon Poh Electronics (Thailand) Co.,Ltd. , BTS Engineer. 2000 (Sep) – 2001 (Oct), Bangkok ,Thailand
(GSM 1800: Nokia network)

• Work as Nokia BTS engineer for Starhub Operator in Singapore.
• Co-ordinate with sub-contractor & RF Team.
• Site survey for new site , expansion site, Swap site from Nortel to Nokia BTS.
• Site survey report (Site location , BTS location & Autocad drawing)
• Performed as telecom implement supervisor. (Both indoor & outdoor)
• Installation ,commissioning & integration GSM 900&GSM1800 for Nokia BTS.( Intratalk ,Metrosite & Ultrasite)
• BTS troubleshooting.
• Site supervisor & site inspector. (Adjust antenna , test feeder & antenna by Site master equipment)
• PAT & FAT site report.
Name : Peeravee Tripakornkusol

SKILLS
• Experience with NOKIA BTS program.(Intratalk , Metrosite & Ultrasite).
• Experience with Autocad.
• Experience with Microsoft office.
• Experience with NOKIA MML command.
• Experience with Ericsson’s TEMS, TEMS investigation, TEMS light and GIMS.
• Experience with NEMO drive test tool.
• Proficient in MapInfo.
• Experience with Actix Analyzer4.1.
• Experience with Huawei BTS program.
• Experience with Coiler repeater , Allgon repeater & AVITEC phase-shift repeater.
• Experience with Huawei BSC&TRU program.
• Experience with Huawei OMC-R network.

• Languages: Thai Fluent, English Good.


COURSES

NECTEC(Thailand)
• Advance Microsoft EXCEL.
• Fundamental Microsoft Access.
NOKIA TRAINING CENTER(Thailand)
• GPRS fundamental.
• NOKIA Ultrasite BTS.( On-job training)
HUAWEI TRAINING CENTER(Thailand)
• Huawei BSS hardware & software.
• Huawei BSS hardware, software, GPRS system, RNP & RNO.
DTAC (Thailand)
• Allgon repeater
• AVITEC phase shift repeater.
• Internal training. (TEMS, NEMO, ACTIX, TEMS Cell Planner etc.)
NOKIA (Kuwait)
Work shop for internal training.
• 3G Radio Planning Overview.
• Node B Overview.
• RNC Overview.
• 3G SGSN Overview.


EDUCATION

Bachelor Degree 2000
King Mong Kut ’s University of Technology Thonburi(KMUTT) ; Thailand
Dep. of Electronic & Telecommunication Engineering
No submited work experiences

Education & Training
 
Education Level: Bachelor's Degree
School Name: King Mong Kut University of Technology Thonburi
Major: electronic & telecommunication engineering
City: Bangkok
Country: Thailand
Graduation Date: 31/03/2000
Description: Not Specified

Languages
Language Level
   
English Fluent

Job Preferences
Job Category: RF Engineer
Job Type: Contract
Job Status: Immediate
Desired Salary: $10000 a month
Desired Location: Any
Willing to Relocate: Yes

Print Preview  |  Go Back   Save
 

On-line Employers (2):
Pawan Pant (LCC), Rocio Alvarado (BANLACE)
On-line Candidates (8):
Alfredo Laiz, ahmed elkady, Fadi Chadli, Datta Aage, Rakan Gharaybeh (Transmission Engineer) ...

Telecoms social networking & live job search engine

Bookmark and Share

 
 
About | Contact Us | Web Business Development by WebWeWeb

Terms | Links | Advertise | Resume Search | Forums & Discussions
3G 4G LTE mobile wireless telecoms communications jobs Telecom search engine & wireless yellow pages  Telecom Search Engine Telecom Search Engine